Al Bustan Street

C.C.C

 We job was is to stabilized exciting wall for deep excavation work so we done 300 bore holes in angle 10% up to 12 meter depth and we installed 25 mm steel bar with spacer and injection HDPE pipe then injected with grout until the end.